|
01/28/26
|
#21
|
DEPARTMENT OF TRANSPORTATION
|
Authorize the Bureau of Asset Management, Performance, and Strategy to enter into an agreement with HDR Engineering, Inc., Bedford, NH, for an amount not to exceed $2,399,992.42 for services necessary |
$2.4M |
approved
|
|
07/30/25
|
#12
|
DEPARTMENT OF TRANSPORTATION
|
Authorize the Bureau of Highway Design to retroactively amend a contract with HDR Engineering, Inc., Bedford, NH (originally approved by G&C on 7/15/20) for preliminary design of improvements to NH Ro |
$2.9M |
approved
|
|
03/12/25
|
#31
|
DEPARTMENT OF TRANSPORTATION
|
Authorize the Bureau of Highway Design to retroactively amend the contract with HDR Engineering, Inc., Manchester, NH (originally approved by G&C on 9/26/20, Item #27), for preliminary design of impro |
|
approved
|
|
03/12/25
|
#31
|
DEPARTMENT OF TRANSPORTATION
|
Authorize the Bureau of Highway Design to retroactively amend the contract with HDR Engineering, Inc., Manchester, NH (originally approved by G&C on 9/26/20, Item #27), for preliminary design of impro |
|
approved
|
|
10/16/24
|
#G
|
DEPARTMENT OF ENVIRONMENTAL SE
|
Authorize to amend an agreement with HDR Engineering, Inc., Manchester, NH (originally approved by G&C on 10/19/22, Item #74), by decreasing the contract by $2,000,000 from $4,000,000 to $2,000,000 fo |
$4.0M |
|
|
06/26/24
|
#115
|
FISH AND GAME DEPARTMENT
|
Authorize to enter into a sole source contract with HDR Engineering, Inc., Manchester, NH, in an amount up to $27,000, to perform technical support and expertise during the EPA NPDES Waste Water renew |
$27,000 |
approved
|
|
06/12/24
|
#S
|
FISH AND GAME DEPARTMENT
|
Authorize to amend an existing contract with HDR Engineering, Inc., Manchester, NH (originally approved by G&C on 11/22/22, Item #81), for the Powder Mill Fish Hatchery Downstream Phosphorus Study by |
$199,980 |
|
|
05/15/24
|
#44
|
DEPARTMENT OF TRANSPORTATION
|
Authorize the Bureau of Highway Design to enter into an agreement with HDR Engineering, Inc., Manchester, NH, for an amount not to exceed $1,491,959.78, for professional engineering and environmental |
$1.5M |
approved
|
|
05/15/24
|
#51
|
DEPARTMENT OF TRANSPORTATION
|
Authorize the Bureau of Bridge Design to amend a contract with HDR Engineering, Inc., Manchester, NH (originally approved by G&C on 12/22/21), for the replacement of the existing Red List bridge carry |
$3.0M |
approved
|
|
05/01/24
|
#40
|
DEPARTMENT OF TRANSPORTATION
|
Authorize the Bureau of Highway Design to retroactively amend a contract with HDR Engineering, Inc., Manchester, NH (originally approved by G&C on 7/15/20), for preliminary design of improvements to N |
|
approved
|
|
12/20/23
|
#C
|
DEPARTMENT OF TRANSPORTATION
|
Authorize to amend a contract with HDR Engineering, Inc., Manchester, NH (originally approved by G&C on 8/26/20, Item #27), for preliminary design of improvements to NH Route 120 in Lebanon, NH by ext |
|
|
|
11/29/23
|
#107
|
DEPARTMENT OF ADMINISTRATIVE S
|
Authorize the Division of Public Works Design and Construction to enter into a contract with HDR Engineering, Inc., Manchester, NH, for a total price not to exceed $6,733,000 for Hatchery Modernizatio |
$7.3M |
approved
|
|
10/04/23
|
#49
|
FISH AND GAME DEPARTMENT
|
Authorize to enter into a sole source retroactive amendment to an existing contract with HDR Engineering, Inc., Manchester, NH (originally approved by G&C on 11/22/21, Item #66), to conduct a Fish Hat |
$985,225 |
approved
|
|
02/22/23
|
#E
|
DEPARTMENT OF TRANSPORTATION
|
Authorize to amend an existing contract with HDR Engineering, Inc., Manchester, NH (originally approved by G&C on 7/15/20, Item #Late A), for preliminary design of improvements to NH Route 1A (Ocean B |
|
|
|
11/22/22
|
#81
|
FISH AND GAME DEPARTMENT
|
Authorize to enter into a contract with HDR Engineering, Inc., Manchester, NH, in the amount of $199,980 to conduct the Powder Mill Fish Hatchery (PMFH) Downstream Phosphorus Study. Effective upon G&C |
$199,980 |
approved
|
|
10/19/22
|
#74
|
DEPARTMENT OF ENVIRONMENTAL SE
|
Authorize to enter into an agreement with HDR Engineering, Inc., Manchester, NH in an amount not to exceed $4,000,000 to provide as needed engineering and technical support services for repair/reconst |
$4.0M |
approved
|
|
06/29/22
|
#H
|
|
Authorize the Bureau of Bridge Design to amend a contract with HDR Engineering, Inc., Manchester, NH, (originally approved by G&C on 12/21/16, item #33), for the final design for the replacement of th |
|
|
|
11/22/21
|
#66
|
NEW HAMPSHIRE FISH AND GAME DE
|
Authorize to enter into a contract with HDR Engineering Inc., Manchester, NH, to conduct the Powder Mill Fish Hatchery Feasibility Study, in the amount of $940,053. Effective upon G&C approval through |
$940,053 |
approved
|
|
06/16/21
|
#47
|
DEPARTMENT OF TRANSPORTATION
|
Authorize the Bureau of Bridge Design to enter into an agreement with HDR Engineering Inc., Omaha, NE, for on-call engineering services for various bridge projects located throughout the State, for an |
$1.0M |
approved
|
|
08/26/20
|
#27
|
DEPARTMENT OF TRANSPORTATION
|
Authorize the Bureau of Highway Design to enter into an agreement with HDR Engineering Inc., Manchester, NH, for preliminary design of improvements to NH Route 120 in the City of Lebanon, for an amoun |
$1.2M |
approved
|
|
07/15/20
|
#24
|
DEPARTMENT OF TRANSPORTATION
|
Authorize the Bureau of Bridge Design to retroactively amend a contract with HDR Engineering Inc., Manchester, NH (originally approved by G&C on 12-21-16, item #33), for the final design for the repla |
|
approved
|
|
01/09/19
|
#20
|
DEPARTMENT OF TRANSPORTATION
|
Authorize Bureau of Bridge Design to enter into an agreement with HDR Engineering Inc., Concord, NH, for on-call engineering services for various bridge projects located throughout the State, for a to |
$1.0M |
approved
|
|
05/02/18
|
#36
|
DEPARTMENT OF TRANSPORTATION
|
Authorize the Bureau of Bridge Design to enter into an agreement with HDR Engineering Inc., Manchester, NH, for preliminary design for the rehabilitation or replacement of the redlisted bridge (Br. No |
$1.9M |
approved
|
|
02/01/17
|
#24
|
DEPARTMENT OF TRANSPORTATION
|
Authorize the Bureau of Bridge Design to enter into an agreement with HDR Engineering Inc., Manchester, NH, for on-call engineering services for various bridge projects located throughout the State, f |
$750,000 |
approved
|
|
06/05/13
|
#230
|
DEPARTMENT OF TRANSPORTATION
|
Authorize the Bureau of Rail & Transit to enter into an agreement with HDR Engineering Inc., Boston, MA, to evaluate the potential development of an extension of commuter rail service operated by the |
$658,316 |
approved
|
|
10/17/12
|
#89
|
DEPARTMENT OF TRANSPORTATION
|
Authorize the Bureau of Bridge Design to enter into an agreement with HDR Engineering Inc., Boston, MA, for the preliminary design for the rehabilitation or replacement of the Red List bridge carrying |
$932,762 |
approved
|